Ischgl, Austria / 06.2018 - 10.2018

Goidinger Bau has added a fourth basement floor to the Hotel Silvretta Alpin in Ischgl. The rebuilding of the existing building's foundations was complicated by the presence of groundwater and extremely limited space.

The first step of the project, securing the hotel building, was followed by excavation works. Next, the Goidinger Bau team shored the structure with jetcrete and piles using the pilgrim step method. This was followed by soil excavation and concrete demolition within the building. The final stage of this unusual hotel construction project consisted of undermining the passenger and goods elevators and moving them deeper underground. 
 

Photo: alpine-style hotel with a stone and timber facade; in front, an après-ski bar “Kuhstall”; to the left of the building, a high scaffold, the lower half of which is covered with light tarpaulins; in the foreground, an open railway crossing gate

Facts & Figures


Company

Type

Hotels

Runtime

06.2018 - 10.2018

Principal
Zangerl Peter

Rebuilding foundations with the pilgrim step method.

Our specialists invested a great deal of effort within a short construction period and in extremely limited space. They were all the happier to complete the project successfully in October 2018. The new basement floor of the well-known sports and luxury hotel now houses storage areas, a plant room, a boiler room and a wine cellar.