Staff accommodation building Trofana Royal
Ischgl, Austria / 05.2018 - 10.2018
In Ischgl, every tourist season means the need for seasonal workers is also increasing. In spring 2018, the Hotel Trofana Royal contracted Goidinger Bau for construction works on a residential building for seasonal workers. A staff accommodation building with a 1,300m2 garage and five upper floors was constructed.
Slope water created initial difficulties for the excavation and delayed the construction start. Flexible thinking on the part of construction management meant that the planned construction period, which had been tight from the outset, could still be observed. Regulatory stipulations, such as a ban on excavation works during the summer months, constituted a further challenge for this complex construction process.
Facts & Figures
Company
Type
Residential construction
Runtime
05.2018 - 10.2018
New staff accommodation building for Trofana Royal.
As the building is situated on a slope, and each floor “rebounds” back into the mountain, it was necessary to find a rapid alternative building sealing solution to hold back the slope water. Goidinger Bau made successful use of the brown tank technique and completed the construction in mid-September, to the complete satisfaction of the client.