High-pressure flushing and rehabilitation of sewers at Rosenheim Central Railway Station

Munich, Germany /

In the course of the project, the first task for THORN Abwassertechnik was to record the condition of the sewer. The next steps were the closure and insulation of unused sewers and the brick lining of the connections in the corresponding shaft structures.

The rehabilitation or partial renewal of the sewers in operation was carried out in various procedures. The technologies used here were sewer rehabilitation up to DN 1500 with winding pipe technology and annular space insulation as well as pipe lining up to DN 300 with inversion technology and hot water curing. 

Photo: THORN employee in white protective clothing with helmet, yellow gloves, and special equipment in front of two orange rehabilitation vehicles (im dt. auch kein Punkt)
© PORR

Facts & Figures


Company

Type

Liner, Inspection

Principal
DB Munich

High pressure for a successful rehabilitation.

The contract also included the installation of a lifting system, the construction of the associated drainage channels on the station forecourt, and the rehabilitation of shaft structures.

Further Facts
High-pressure flushing and rehabilitation of sewers at Rosenheim Central Railway Station

Service duration
03.2015 - 12.2018

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.