Tunneling

Trzcinsko Tunnel LK274

Trzcinsko, Poland / 01.2023 - 05.2024

The refurbishment of the Trzcinsko Tunnel has significantly increased transport speeds and brought this section of the line up to the latest technical standards – all whilst rail services continued to run.

air arch section, entry into the rock
© PORR

Facts & Figures


Company

PORR Bau GmbH, PORR S.A.

Type

Tunneling

Runtime

01.2023 - 05.2024

Principal
PKP Polskie Linie Kolejowe S.A

Tunnel construction whilst rail services continue to operate

An existing railway tunnel was refurbished on the LK 274 railway line between Walbzych and Jelenia Gora. The works involved widening the 300-metre-long existing tunnel using the ‘tunnel-in-tunnel’ tunnelling method. This method allows rail services to continue without interruption throughout the entire tunnelling process. Another distinctive feature of this project is that the power supply for rail traffic was maintained via an overhead line.

The tunnelling was carried out using a tunnel-widening portal (TWP), whilst the inner lining work was performed using a formwork system comprising reinforcement, rehabilitation and formwork carriages. All work was carried out in 24/7 shift operations to complete the construction project as quickly as possible.

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.