St. Pölten main station, construction lot 1
St. Pölten, Austria / 03.2007 - 12.2010
PORR took over in consortium all earth, concrete and bridging works for the reconstruction of the St. Pölten main station. In the process, the 60 m long pedestrian tunnel- east with three platform accesses, 7 platforms, the 380 m long north side cantilever wall 2, a station passage and the 76 m long SchöpferstraĂe underpass were newly erected in the station area. The existing pedestrian passage was adapted and the 92 m long PraterstraĂe underpass removed and rebuilt. In addition, the contract also contained various hydraulic structures such as retention chambers and retaining reservoirs.
Facts & Figures
Company
PORR Bau GmbH in a consortium
Type
Railway construction, Asphalt and concrete production
Runtime
03.2007 - 12.2010
New railway station for the Lower Austrian regional capital.
Some of the construction work was carried out in the danger zone of tracks without track barriers.