ÖAMTC base, Dornbirn, outdoor facilities
Dornbirn, Austria / 08.2022 - 10.2022
The outdoor facilities at the ÖAMTC centre in Dornbirn have undergone a major update: Firstly, we professionally demolished the existing outdoor area to make roomfor the new facilities. Following this, an efficient drainage system was installed, consisting of pipes with a diameter of 200 mm and inlet shafts. This ensures reliable drainage of surface water. Carefully laid electrical conduits secure the flow of electricity, and the newly installed foundations for the barrier system form the basis for safe and smooth traffic control.
Facts & Figures
Company
PORR Slovensko a.s.
Type
Road construction, Outdoor facilities
Runtime
08.2022 - 10.2022
New look for ÖAMTC Dornbirn: Stylish exterior surfaces or Modern and functional: new exterior surfaces for ÖAMTC Dornbirn
Maximum power for electric cars
We have built a state-of-the-art charging park for the charging stations of Vorarlberger Kraftwerke (VKW) - including a transformer station, which provides a reliable supply of energy. Granite kerbs set clear boundaries, while freshly asphalted traffic areas enable safe and convenient use.