Structural engineering
N02, EP Amsteg – Göschenen, Main works
Amsteg - Göschenen UR, Switzerland / 02.2022 - 11.2023
After completion of the securing measures on the Gotthard north ramp, PORR SUISSE AG has started the main works on the A2 motorway. In the section between Amsteg and Göschenen, the national road is being renewed on behalf of the Federal Roads Office (FEDRO).
The project includes the rehabilitation of the route, bridges and retaining walls as well as renovation work on galleries and tunnels.
Trassee
- New construction of surface and binder course over a length of approx. 13.9km
- New construction of vehicle restraint systems over a length of approx. 12.4km
Bridges/viaducts
- Replacement, reinforcement and repair of 20 bridges and viaducts
- Rock anchor work
- Replacement of roadway crossings at 9 bridges/viaducts
- Reconstruction of the superstructure bearing
Facts & Figures
Company
PORR SUISSE AG in consortium
Type
Structural engineering
Runtime
02.2022 - 11.2023
Renovation of the A2.
Galleries
- Reinforcement and repair of supporting structures in portal areas at 4 galleries
- Repair of anchorages at 3 galleries
- Widening of 24 supports at the Wilerplanggen gallery
Tunnels
- New construction of a total of 5 cross galleries in the Platti, Teiftal and Naxberg tunnels
- Conversion of a transformer room into a new cross gallery in the Langlaui tunnel
- Adjustment of 2 cross galleries in the Naxberg tunnel
- Repair work in 7 tunnels
- Removal and replacement of ceramic tiles in 5 tunnels
- Removal and replacement of surface protection in 7 tunnels
Retaining walls
- Reinforcement of the retaining wall at the Höll FBNO lean-to viaduct with prestressed anchor
- Various maintenance measures with prestressed anchors on 8 retaining walls