LKH Feldkirch Reconstruction East outdoor area

Feldkirch, Austria / 09.2021 - 01.2023

The outdoor facilities of the LKH Feldkirch main entrance east were completed at the beginning of 2023 and represented a versatile construction site. Among other things, approx. 70m of prefabricated concrete benches were moved, 700m² of coloured asphalt was laid and 150m of drainage pipes were dug and laid. The realisation of this work was challenging,

Hospital driveway with spacious entrance area to the hospital.

Facts & Figures


Company

Nägele Hoch- und Tiefbau GmbH

Type

Road construction, Outdoor facilities

Runtime

09.2021 - 01.2023

Principal
Vorarlberger Krankenhausbetriebsges. mbH

Comprehensive civil engineering works at LKH Feldkirch

as a tight schedule had to be adhered to and close cooperation with other companies and trades was required. Ensuring access to the hospital for emergencies was always a particular priority. Despite these challenges, the project was successfully completed.