bridge construction
Küssnacht SZ rail underpass
Küssnacht, Switzerland / 2013
In the course of this project under contract to SBB AG, PORR completed the spectacular replacement of a 100-year-old underpass with a new construction.
Facts & Figures
Company
PORR SUISSE AG
Type
Bridge construction
Runtime
2013
600 tonnes shifted.
All bridge elements were prefabricated next to the platform. The foundations had to be reinforced and adapted prior to assembly. A total shutdown was instituted one weekend, during which the old structure was removed, the new 600-tonne bridge inserted, and the railway embankment built up again. After the new installation of the platforms, a temporary road surface was completed in time for Monday morning.