Back to overview
Road construction

K27 Bristenstrasse - stage 2024, natural hazard measures section Bristen - St. Antoni

Bristen, Switzerland / 04.2024 - 11.2024

The K27 Bristenstrasse is a narrow, winding cantonal road. Apart from the few passing places, it is difficult for two vehicles to cross. The work and logistics must therefore be planned very carefully. All deliveries and transports must be carried out by 2-axle lorries with a weight limit of 18 tonnes. Exceptions require a request with special authorisation.

Construction of new protective measures against natural hazards for the cantonal road section of the Bristenstrasse between Amsteg and St. Antoni. The project includes the natural hazard measures in the implementation year 2024.

Photo: Above the narrow cantonal road, the rock is secured using six rockfall protection systems.

Facts & Figures


Company

PORR SUISSE AG

Type

Road construction

Runtime

04.2024 - 11.2024

Principal
Canton of Uri, Uri Building Department

K27 Bristenstrasse - stage 2024, natural hazard measures section Bristen - St. Antoni

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.