Rock technology
K27 Bristenstrasse, Renovation RBBS 04+115 bis RBBS 12+085
Bristen UR, Switzerland / 05.2022 - 10.2022
Every two years, renovation and safety works take place on the narrow and winding Bristenstrasse to ensure continued safety.
In 2022, the contract for PORR SUISSE AG - following the works in 2017 and 2020 - included the renovation and partial reconstruction of retaining walls, retaining structures as well as roadway and drainage.
The work was carried out during temporary road closures and partly in night shifts.
Facts & Figures
Company
PORR a.s.
Type
Rock technology, Structural engineering
Runtime
05.2022 - 10.2022