Intschi UR, Switzerland / 10.2018 - 06.2020

As part of the K2 Gotthard road Amsteg - Göschenen, the natural stone arch bridge with a span of 21 m crosses the Intschialpbach. The cavities were filled in as early as 2015, the natural stone masonry was re-grouted and the arch soffit cleaned. In addition, the roadway was now widened with a new, 6.20 m wide roadway slab made of in-situ concrete. As this also serves as a sealing support, the construction was carried out with epoxy resin sealing and polymer bitumen sealing sheeting.

Photo: Aerial view of construction work at night; in the foreground right two large construction machines, left the installation site with a crane tower

Facts & Figures


Company

PORR Equipment Services Deutschland GmbH

Type

Bridge construction

Runtime

10.2018 - 06.2020

Principal
Uri, Amt für Tiefbau

Natural stone arch bridge with historical background.

Rock stabilisation on the 200-year-old bridge was also part of the contract. The underwater shield wall and the wing wall on the Amsteg side were built in advance. Rock removal, rock drilling and the relocation of anchors and micropiles were carried out on the suspended rope.