Residential construction

Horizon Dorigny – Preparatory work

Chavannes-près-Renens, Switzerland / 09.2021 - 06.2022

PORR SUISSE AG realised the preparatory works of all construction sites for eight structures in four lots (A/B/C/D) for the Horizon Dorigny quarter, located to west of Lausanne.

The contract included:

  • Access roads to open up the entire construction site perimeter
  • Construction site fencing with a central gate in front of the access to the individual lots
  • 250'000 m³ excavation incl. excavation support
  • Disposal of contaminated excavated material
Photo: huge excavation pit taken from above; Lake Geneva in the background

Facts & Figures


Company

PORR SUISSE AG

Type

Residential construction

Runtime

09.2021 - 06.2022

Principal
Credit Suisse Investment Foundation and Demaurex & Cie S.A.

Professional realisation through professional preparation.

  • Groundwater lowering, de-watering, incl. treatment and re-injection during the entire construction period
  • Excavation of earth and recording of finds in accordance with the specifications and under the supervision of the Cantonal Archaeological Service
  • Demolition of part of the noise barrier to the motorway
  • Construction and commissioning of the transformer station

To the PORR project video “Excavation works and special civil engineering works in December 2021”

Further Facts
Horizon Dorigny – Preparatory work

Architect
Pezzoli & Associés, Architectes SA, Renens

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.