The construction of the new production facility for WM Immobilien GmbH has resulted in a forward-looking industrial building that is specially tailored to the requirements of Siemens Energy as the user. The plant manufactures transformers, which requires functional production areas as well as high-quality office space and well-designed outdoor facilities. The project combines industrial efficiency with modern architecture and sustainable construction principles.

Large modern production hall in the countryside
© Schiffer Photodesign

Facts & Figures


Company

PORR Bau GmbH

Type

Industrial construction, General contractor services

Runtime

07.2024 - 09.2025

Efficient use of space and contemporary architecture

The production area of the facility covers around 23,000 m² and offers optimal conditions for industrial manufacturing processes. This is complemented by a prestigious office complex with an area of around 6,050 m², which extends over five above-ground floors. The architectural design of the office building combines clear lines with functional room organization, creating a modern working environment that supports both efficiency and quality of life.

Sustainability as a key planning element

A key feature of the production facility is its consistent focus on sustainability. The green facade actively contributes to improving the microclimate, reduces the building's heat load, and at the same time underscores the architectural aspirations of the project. In addition, great importance was attached to energy-efficient building technology, the use of environmentally friendly materials, and resource-saving construction methods. As a result, the project meets high ecological standards and supports long-term economic building operation.

Optimized construction processes through LEAN construction

The project was implemented using LEAN construction methods. Structured planning and continuous optimization of the construction processes ensured a high level of quality, efficiency, and adherence to deadlines. With this approach, the production facility for Siemens Energy sets new standards for innovative, sustainable, and efficient industrial buildings.
 

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.