Diaphragm wall in the steelworks
Linz, Austria / 2015
In the area of the CC8 continuous casting plant at the voestalpine steelworks in Linz, an 80cm-thick diaphragm wall with deep foundations was to be installed down to a depth of up to 19m. The jet grouting method was used to create the deep foundations in the area of the gantry crane supports. In total, PORR installed some 4,500m² of diaphragm wall using heavily reinforced cages with an overall weight of 455t (up to 220kg/m²).
Facts & Figures
Company
PORR Bau GmbH
Type
Special civil engineering
Runtime
2015
Firmly founded in the soil ...
One of this project’s greatest challenges lay in the fact that trenching had to take place at restricted heights in the plant/industrial production area.