Pipeline construction

Chrudim hot-water pipeline and hot-water transfer station

Chrudim, Czech Republic / 06.2013 - 09.2014

This project involved laying a total of 3,736m of district heating hot-water pipes and installing eleven transfer stations.

Photo: concreted interior space with system consisting of pipes, pressure vessels, levers and valves

Facts & Figures


Company

PORR a.s.

Type

Pipeline construction

Runtime

06.2013 - 09.2014

Principal
Elektrárny Opatovice, a.s.

Heating Chrudim.

PORR was responsible for all earthworks for this project, including excavating and subsequently backfilling trenches, creating pipeline beds and demolishing and replacing asphalt surfaces, pavements and other paved areas. A 200mm thick steel-fibre concrete road surface layer was also included in the project.