Pipeline construction
Chrudim hot-water pipeline and hot-water transfer station
Chrudim, Czech Republic / 06.2013 - 09.2014
This project involved laying a total of 3,736m of district heating hot-water pipes and installing eleven transfer stations.
Facts & Figures
Company
PORR a.s.
Type
Pipeline construction
Runtime
06.2013 - 09.2014
Heating Chrudim.
PORR was responsible for all earthworks for this project, including excavating and subsequently backfilling trenches, creating pipeline beds and demolishing and replacing asphalt surfaces, pavements and other paved areas. A 200mm thick steel-fibre concrete road surface layer was also included in the project.