Back to overview
Road construction

Bypass Arad

Arad, Romania / 03.2009 - 03.2011

In the west of Arad, a city of 160,000 people, PORR realised a 12km bypass for improved accessibility and transport connections. The scope of work also included four motorway bridges and a 507m long bridge over the MureÈ™ River.

Photo: aerial view of the bridge traversing the MureÈ™ River in misty sunlight; rural area on the right; suburban houses on the left; the city of Arad in the background
© PORR

Facts & Figures


Company

JV FCC, PORR Technobau und Umwelttechnik, PORR Construct S.R.L.

Type

Road construction

Runtime

03.2009 - 03.2011

Principal
C.N.A.D.N.R. S.A. (Romanian National Company of Motorways and National Roads)

Six lanes over the MureÈ™ River

The motorway section was drafted with a design speed of 100km/h.  The motorway’s target width was 26m and four main lanes of 3.75m each as well as two emergency lanes of 4m each were executed. Building four motorway bridges was also part of this infrastructure and road construction project, with the 507m long bridge over the MureÈ™ being the most impressive single structure.

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.