Back to overview
Bridge construction

Bridge over the Odra River

Kędzierzyn Koźle, Poland / 08.2008 - 08.2010

With a span of 140m, the bridge over the Odra River was the largest cantilever bridge built in Poland at that time. This also attracted significant interest in the project from the public and the media, a project realised by PORR between 2008 and 2010.

Photo: Bridge over the Oder: The cantilever motorway bridge over the River Oder

Facts & Figures


Company

PORR Polska Infrastructure S.A.

Type

Bridge construction, Road construction

Runtime

08.2008 - 08.2010

Principal
GDDKiA o. w Opolu

Bridge with a span of 140m.

Today the bridge represents a significant part of the almost 3.5km-long section B of the southern bypass from Kędzierzyn Koźle. This includes a total of seven civil structures: three passages, three bridges and an overpass.