Stage VII - Halls 5 and 6
A. Pöttinger spol. s r.o. Vodňany
Vodňany, Czech Republic / 11.2015 - 03.2017
PORR constructed two additional assembly halls at the Vodňany site of agricultural machinery manufacturer Pöttinger. The new buildings, Halls 5 and 6, house the complex assembly of ploughs, disc cultivators and seeders, among other tasks.
Facts & Figures
Company
Type
Industrial construction
Runtime
11.2015 - 03.2017
A successful collaboration continued with the expansion of two assembly halls.
The load-bearing construction of the halls consists of steel and concrete. The lightweight outer covering layer comprises a heat retention system. The concrete flooring was coated with a cover layer of artificial resin concrete.
Both halls serve to house metal-cutting machinery along with assembly and logistics. This increases the chip machining capacity of the company. The completion of these buildings marked the conclusion of expansion works at the Pöttinger plant in Vodňany.